Customization: | Available |
---|---|
Casting Method: | Thermal Gravity Casting |
Process: | Investment Casting |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
R&D
|
Softward: Solidworks, CAD, Procast, UG
Development cycle of samples: 25-35 days
|
Materials
|
Stainless steel: 304/304L, 316/316L, 410/416 etc Duplex stainless steel: 2250, 2507, Zeron 100 etc Carbon steel Alloy steel |
Technical Parameter
|
Part weight: 2g to 30kgs Max dimension : 600mm for diameter or length Min wall thickness : 1.5mm Casting roughness: Ra3.2-6.4 Machining roughness: Ra1.6 Tolerance of casting: CT6 Inner core: ceramic core, urea core, water soluble wax core. |
Heat treatment
|
Normalzing, Tempering, Quenching, Annealing, Quenching & Tempering, Caburization, Solution treatment.
|
Surface treatment
|
Polishing, bead blasting, zinc plating, hot dip galvanized, nickel plating, passivation,
Electro-polising, mirror polishing, Brush polishing, PE coating, Powder coating, etc
|
Inspection
|
Cleanliness inspection, X-Ray radiographic inspection, MIM inspection
|
Production capacity
|
More than 120 tons per month
|
Quality Certificates
|
ISO9001
ISO14001
|
Q1: What is our payment term?
A:T/T, Paypal.
Q2: How can we quote for you?
A: Please email us enquiry with all technical drawings you have, such as material grade, tolerance, mechanical
properties, heat treatment, requirements, etc. Our specialized engineers will check and quote for you within 24 hours.
Q3: Which product are often processed by your company ?
A: Auto parts,machinery part, marine part, Kitchen parts, Agricultural parts.
Q4: Which material are often used ?
A: Stainless steel. alloy steel, carbon steel, aluminum, copper.
Q5: Which finish you can provide ?
A:Sand blasting, Tumbling, Polishinh, Electro-polishing, Mirror Polishing, Powder coating, Electrophoresis, ETC.
Q6: What is the MOQ ?
A: Based on the product, normal 100 pcs.
Q7: Can we make the samples?
A: Is Available, 15-20days for sampling.
Q8: How about for the lead time?