Product description
Description |
Sand Casting /Grey iron sand casting/Ductile Iron Casting |
Casting process |
precoated sand casting/precision casting/shell mold casting |
Material |
GG15.GG20.GG25.GG30.GG35,
GGG40-,GGG50,GGG60,GGG70,GGG80,
QT400-18QT450-10QT500-7QT600-3 |
Certificate |
ISO9001, FM Approval |
Surface |
Paint in Black, grey or red according to customer's requirment,KTL |
Machined by |
CNC Vertical lathe and CNC machining center |
Packing |
Wooden pallet |
Balance test |
Available |
Application |
Automative, pump and valve, agriculture machinery and other machinery part |
Company Introduction
Advantages of Sand Casting
- Almost any ferrous and non-ferrous metals can be casted by sand casting
- Parts caan vary greatly in size, weight and shape. Weight can be from ounces to hundreds of tons
- Cost of tools is low comparing to other process
- Small quantity or large quantity
- Relative low cost for high volume parts
Materials and Secondary Operations of Sand Casting We Offer
- Materials can be aluminum alloy, ductile iron, brass alloy, gray iron etc.
- Grinding, drilling, tapping, painting, shot blasting
- High precision machining
- Heat treatment
- Assembly, packaging
Certifications:
Q1: What is our payment term?
A:T/T, Paypal.
Q2: How can we quote for you?
A: Please email us enquiry with all technical drawings you have, such as material grade, tolerance, mechanical
properties, heat treatment, requirements, etc. Our specialized engineers will check and quote for you within 24 hours.
Q3: Which product are often processed by your company ?
A: Auto parts,machinery part, marine part, Kitchen parts, Agricultural parts.
Q4: Which material are often used ?
A: Stainless steel. alloy steel, carbon steel, aluminum, copper.cast iron.
Q5: Which finish you can provide ?
A:Sand blasting, Tumbling, Polishinh, Electro-polishing, Mirror Polishing, Powder coating, Electrophoresis, ETC.
Q6: What is the MOQ ?
A: Based on the product, normal 100 pcs.
Q7: Can we make the samples?
A: Is Available, 15-20days for sampling.
Q8: How about for the lead time?
A: Normally about 35 days for mass production, pls inform us if it is urgent order.